Installation of Ecological Filtration Station
- 2017–2020
- OPŽP
Reduction of emitted pollutants by acquiring a filtration station to capture solid particulate matter from the wood waste boiler.
As part of our responsible approach to the environment in the Eagle Mountains, we installed a modern filtration station. The total project costs reached CZK 4,487,696.
This step led to a significant reduction in the ecological footprint of our production and the elimination of solid particles emitted into the air during the ecological biomass heating of the complex.
Project
Official Project Data
Title
Installation of a filtration station for the capture of solid pollutants
